top of page
所有新闻和项目


在林查班进行水下摄影,以评估船体及其部件的状况。
MaxiDive completed an underwater photo inspection at Laem Chabang Port, Thailand, documenting hull plating condition, marine growth, appendages, bow thruster gratings, propeller assemblies, rope guard, stern tube seal, rudder condition, and anode status for technical review.

MaxiDive
5月21日


Koh Si Chang 对螺旋桨进行抛光,以提高集装箱船的效率
MaxiDive completed a propeller polishing operation at Koh Si Chang Anchorage for a container vessel, using professional underwater equipment to restore the propeller blade surface and support vessel efficiency without dry docking.

MaxiDive
5月19日


在泰国 Koh Si Chang 岛锚地检查油渍。
MaxiDive completed an underwater oil stain inspection in Thailand at Koh Si Chang Anchorage, confirming the condition of the vessel’s bulbous bow, vertical sides, and rudder area. The inspection verified that no oil stain remained below the waterline and that only minor superficial marks were observed above the waterline.

MaxiDive
5月18日


泰国洗涤器检查:在林查班港进行OVBD水下检查。
MaxiDive completed a scrubber inspection Thailand project at Laem Chabang Port, including underwater inspection of the scrubber overboard discharge, hull condition assessment, and propeller polishing support while the vessel remained afloat.

MaxiDive
5月15日


泰国水下阳极焊接:在 Kerry Siam 海港安装舵阳极。
MaxiDive completed an underwater anode welding Thailand project at Kerry Siam Seaport. The operation included welding and securing sacrificial anodes to the vessel’s rudder to support cathodic protection and corrosion control while the vessel remained afloat.

MaxiDive
5月14日


泰国海底密封工程:为 Koh Si Chang 锚地的泄压阀更换提供支持。
MaxiDive completed an underwater plugging Thailand project at Koh Si Chang Anchorage. The operation supported discharge valve replacement by locating and temporarily plugging multiple overboard discharges while the vessel remained afloat.

MaxiDive
5月14日


泰国舵间隙测量:林查班港水下勘测。
MaxiDive completed a rudder clearance measurement Thailand project at Laem Chabang Port. Divers performed CCTV-recorded underwater clearance measurements at six marked positions between the rudder upper and lower plates using vessel-provided steel measurement tools.

MaxiDive
5月14日


在林查班进行水下船舶检验:根据美国船级社 (ABS) 标准对船舶进行水下检验,以检查其状况。
MaxiDive completed a UWILD inspection Laem Chabang project with ABS Class attendance. The in-water survey covered hull plating, appendages, propeller assemblies, bow thruster, marine growth condition and underwater documentation while the vessel remained afloat.

MaxiDive
5月11日


UWILD在泰国的检验:对宋卡锚地的ABS级船舶进行水下检验。
MaxiDive completed a UWILD inspection Thailand project approved by ABS Class at Songkhla Anchorage. The in-water survey covered hull plating, appendages, propeller assemblies, rudder condition, marine growth assessment and underwater documentation without dry docking.

MaxiDive
5月8日


泰国阴极保护装置更换:林查班港海底阴极保护装置维护。
MaxiDive completed an ICCP replacement Thailand project on a container vessel at Laem Chabang Port. The operation supported underwater cathodic protection system maintenance, corrosion prevention, and vessel integrity without dry docking.

MaxiDive
5月7日


在泰国安装水下沉箱以取代测速桩
MaxiDive completed an underwater cofferdam installation Thailand project at Ko Si Chang Anchorage to support safe speed log transducer replacement. The operation was completed without leakage, using a waterproof cofferdam system and certified commercial divers.

MaxiDive
5月6日


泰国海底外部密封:船舶泄漏修复紧急作业。
MaxiDive completed an underwater external plugging Thailand operation to seal an overboard discharge and enable safe onboard valve replacement. The repair was executed efficiently without dry docking, ensuring no leakage, minimal downtime, and full operational safety of the vessel.

MaxiDive
5月5日


在泰国进行船首推进器检查和缠绕绳索清除。
MaxiDive completed a bow thruster inspection Thailand project, including removal of a heavy rope entanglement. The underwater inspection confirmed no structural damage, no leakage, and full operational status of the thruster system. Early detection prevented potential downtime and costly repairs.

MaxiDive
4月30日


在ABS专家的监督下,在泰国进行水下勘探。
Professional in-water survey in Thailand under ABS Class supervision with full underwater inspection of hull, appendages, propeller, and rudder systems.

MaxiDive
4月28日


在泰国进行水下拍摄,参加美国船级社(ABS)港口作业课程
MaxiDive successfully performed an in-water survey in Thailand with ABS Class, delivering certified underwater inspection services directly in port conditions.

MaxiDive
4月27日


UWILD 在泰国的检验:如何避免干船坞维修并减少船舶停工时间。
UWILD inspection in Thailand allows shipowners to avoid dry dock while maintaining full class compliance. Learn how in-water surveys reduce downtime and operational costs.

MaxiDive
4月22日


泰国CII合规性:为什么船体状况现在直接影响船舶评级。
CII compliance in Thailand is becoming a critical factor for vessel operations. Hull condition, propeller efficiency, and underwater maintenance now directly impact fuel consumption, emissions, and vessel ratings.

MaxiDive
4月20日


在泰国更换水下测速仪
MaxiDive completed underwater speed log replacement in Thailand in cooperation with FURUNO Service, delivering efficient in-water solutions without dry-docking.

MaxiDive
4月17日


泰国船体清洗和螺旋桨抛光
Professional hull cleaning and propeller polishing services in Thailand to improve vessel efficiency, reduce fuel consumption, and ensure compliance with industry standards.

MaxiDive
4月16日


泰国螺旋桨抛光和水下检测
Professional propeller polishing and underwater inspection services in Thailand to improve vessel performance, efficiency, and compliance.

MaxiDive
4月16日
bottom of page
