top of page


Underwater External Plugging Thailand: Emergency Ship Leak Control Operation
MaxiDive completed an underwater external plugging Thailand operation to seal an overboard discharge and enable safe onboard valve replacement. The repair was executed efficiently without dry docking, ensuring no leakage, minimal downtime, and full operational safety of the vessel.

MaxiDive
May 5


UWILD Inspection Thailand: How to Avoid Dry Dock and Reduce Vessel Downtime
UWILD inspection in Thailand allows shipowners to avoid dry dock while maintaining full class compliance. Learn how in-water surveys reduce downtime and operational costs.

MaxiDive
Apr 22
bottom of page
